| November 29, 2007 |
|
|
|
 |
Construction finally begins! |
The Court Street Service Building must be demolished to make way for the CRWC. |
The old UI Police station will be demolished as well. |
View from the intersection of Burlington and Madison Streets. Off in the distance, you can see part of the Field House, between the two tower Residence Halls, Reinow & Slater. |
|
|
|
|
| View of Front Street from the southwest corner of the site. The spectator entrance for the Competitive Swimming Pool will be off Front Street. |
View from the southeast corner of the site. Each of our neighbors can be seen in the distance - The Main Library, Lindquist and a gas station. |
View of the site from the southeast corner. |
|
| |
| January 30, 2008 |
|
|
|
|
| |
| March 13, 2008 |
|
|
|
|
Photos consist of steam vaults and pile cap installation for structural concrete loading. The last photos also includes the water service piping for the facility.
|
| |
| April 1, 2008 |
|
|
|
|
Lower level from east midpoint #2 |
Lower level north looking east |
South steam tunnel construction |
|
| |
| April 9, 2008 |
|
|
|
|
|
|
|
|
| |
| April 28, 2008 |
 |
 |
 |
 |
| East steam tunnel looking south |
Grid 9.2 looking south |
Southeast corner of the basement level looking southwest |
South of the basement level looking east |
| |
| April 30, 2008 - Taken from the top of the construction crane |
 |
 |
 |
 |
| Northeast Upper Elevation Pile Caps |
Northern midsection, basement level |
Northern section, east steam tunnel |
South end east steam tunnel viewing north |
 |
 |
|
|
| South steam tunnel view west |
Tower crane viewing northwest |
|
|
|

|
|
|
|